week nine
The last week at April Lab at Ann arbor was spent in polishing up and building all the robots. We planned to leave for Muscatatuck in the last week.
This last week was very hectic. I spent most of my time completing the soldering for 10 boards. Testing was done on the first PCB prototype, and after sufficient proof that the board would be effective for the trip, I started working on getting the other boards done for 6 robots.
Unfortunately, a lot of time was spent in helping with robot assembly and printing.
The 3D printer for the Lab started having problems in the last 2 weeks and so I was unable to print my sensor mounts for all six robots. Only 1 sensor mount was completed in time, and so we left with that one, and a couple of extra boards.
This last week was very hectic. I spent most of my time completing the soldering for 10 boards. Testing was done on the first PCB prototype, and after sufficient proof that the board would be effective for the trip, I started working on getting the other boards done for 6 robots.
Unfortunately, a lot of time was spent in helping with robot assembly and printing.
The 3D printer for the Lab started having problems in the last 2 weeks and so I was unable to print my sensor mounts for all six robots. Only 1 sensor mount was completed in time, and so we left with that one, and a couple of extra boards.